Lebanon and Laclede County
Building pads and site prep in Lebanon, MO
We prep ground for houses, shops, barns, and garages. That means cutting the high side, filling the low side, and leaving a pad your builder can lay out.
A pad is only as good as the drainage around it. We shape the building spot and send water away from the footprint. If the lot needs a drive to reach it, we can price that with the pad.
If your builder or the county wants a compaction test, we leave the pad ready for that inspector. We do not invent a test result. The estimate says what we will cut, fill, and grade.
What the work includes
- House, shop, barn, and garage pads
- Cut and fill to the agreed grade
- Drainage sloped off the building spot
- Rough grade tied into a drive when you need one
Questions people ask
Do you stake the building?
Your builder or surveyor should set the building where it belongs. We grade to the layout you give us and walk it with you before we leave.
Can you pad a sloped lake lot?
Often. Slope, rock, and how much fill you need are why we look first. Some lots are a straightforward cut. Some are not.